Free flooring estimate template

Flooring estimate template

Flooring is sold per square foot and delivered on whatever subfloor is underneath. This template prices both, and covers the waste factor customers always query.

From

[Your business name]

[Phone] · [Email] · [License #]

Estimate #

[0001]

Date: [__/__/____]

Prepared for

[Customer name]

[Job address]

DescriptionQtyRateAmount
Tear out and dispose of existing floor (per sq ft)650$1.20$780.00
Subfloor prep and levelling1$540.00$540.00
Flooring material incl. 10% waste (per sq ft)715$4.20$3,003.00
Underlayment650$0.55$357.50
Installation labor (per sq ft)650$3.10$2,015.00
Transitions, trim and reinstall baseboard1$480.00$480.00
Estimated total$7,175.50

Terms

  • Material quantity includes 10% waste allowance, standard for cut loss.
  • Subfloor levelling beyond 1/4 inch over 10 ft billed separately.
  • Customer to clear furniture unless moving is quoted.
  • Material to acclimate on site 48 hours before installation.

 

Customer signature

 

Date

Copy the block above into a document, or skip the copy-paste — QuoteFlow fills it in, totals it, and gets it signed on the customer's phone.

Stop re-typing the same estimate

QuoteFlow keeps your line items, builds the PDF, and gets an e-signature before you leave the driveway. First 10 quotes free, then $29/month for unlimited.

Start using QuoteFlow

Explain the waste factor before they ask

You order 715 square feet for a 650 square foot room, and the customer notices. Cuts, pattern matching and defective boards mean 8-12% waste is normal, and running short mid-job means a dye-lot mismatch. Put the waste allowance on its own line with the percentage stated. It turns a suspicious-looking number into evidence you know what you are doing.

Price the subfloor you have not seen

Under the old carpet could be a flat, sound subfloor or forty years of water damage. Give a levelling allowance and state the tolerance you have priced — typically a quarter inch over ten feet. Anything worse gets quoted before you proceed, in writing.

Acclimation is not optional

Wood and laminate need 48 hours on site before installation or they will expand and buckle later. Customers pushing for a same-day start need to see this on the estimate, because when the floor cups in six months they will remember who laid it, not who rushed it.